The U.S. Army plans to blow up 68 drums of degraded lead azide in place on Wednesday morning, Nov. 25; the exact time hasn't been announced. The blasts they will send dust carrying lead particles downwind. The map below runs an independent model of where that lead could settle and how much. Use it with the checklist for your household or farm.
The map estimates lead dust settling on outdoor surfaces, in micrograms per square foot, from the blast size, the weather and how much lead escapes the bunkers. It opens on the National Weather Service hourly forecast starting Wednesday noon, the earlier planned hour (the Army now says morning, with no exact time), and follows the wind as it changes through the afternoon and evening. It uses the permit's two dust levels, 5 and 100 µg/ft², and outlines where airborne lead could top the permit's 0.18 µg/m³ for an hour. Change any setting and the map recalculates. Pick a town or tap anywhere for numbers. For street detail, press Street map at the top right of the map and zoom in.
Yardsticks: the permit's advisory area is ≥5 µg/ft² and its wet-clean area ≥100 µg/ft², the same numbers as EPA's floor and window-trough dust action levels (windowsills are 40). EPA's residential soil screening level is 200 ppm. The permit maps airborne lead down to 0.18 µg/m³ hour by hour; the whole-event figure is a share of the lead air standard (0.15 µg/m³ averaged over 3 months).
The map follows the forecast hour by hour from the blast: the wind can turn, and at sunset most of the dust stays aloft instead of settling. The dial, speed, sky and rain below show the blast hour only. Change any of them to try a steady wind instead.
The Army says Wednesday morning but hasn't announced the hour, so the times below are from the original plan. Click a step to see it on the map.
EPA's emergency permit of Nov. 13 sets the weather limits, the maps the Army must publish and the sampling afterward. Details below come from the permit, the Army's permit application and its sampling plans, all posted on EPA's site.[permit] [application] [sampling plan]
Each map shows two dust areas (≥5 and ≥100 µg/ft²) and airborne lead hour by hour, outlined at 0.18 µg/m³. The maps must assume all of the lead goes airborne (see the next card).[permit, App. B]
5 and 100 are the same numbers as EPA's dust-lead action levels for floors and window troughs. The Army's official maps must treat 100% of the lead as airborne. EPA expects the real release to be lower but says no one can yet put a number on how much the bunkers, barriers and water will hold back. That is why the Army's maps run larger than this site's 5% default; pick Permit case on the map to compare.[permit, App. B]
No blast if any of these is forecast at the blast time or in the 3 hours after:[permit, IV.O.3]
The Army also says it will avoid winds that would carry smoke over a public area within 1 mile and make reasonable efforts to avoid wind from the southwest, which blows toward Middletown and Burlington. Its blast crew can override the limits for an unusual and immediate safety problem.[application, 4.3.7] The map's weather panel checks the limits it can from the NWS forecast.
Source: the Army's permit application, sections 1, 4 and 6.[application]
EPA's review assumes settled lead mixes into the top 2 cm (under an inch) of untilled soil.[application, Sec. 13] Spread that thin, even 100 µg/ft² adds only about 0.04 parts per million to soil. Raising soil lead by 200 ppm, EPA's level for homes, would take about 560,000 µg/ft², thousands of times more than the wet-clean level.
On hard surfaces, though, the dust stays on top, where hands, toys and pets pick it up. That is why the advice is to wet-clean play equipment, sills, railings and decks, and not to dry-sweep.
Steps come from the Army, Iowa HHS and Iowa State Extension. Your checks are saved in this browser only.
This is a screening model, the kind emergency planners use for a first estimate. Inputs come from public sources. The results are useful for comparing places and scenarios. They are not a prediction of what samplers will measure.
| Input | Value used | Basis |
|---|---|---|
| Lead in the drums | ≈6,950 lb (3,150 kg) | 9,773.5 lb of material (Army declaration) × 71.1% lead |
| Share escaping as dust | 5% (0.5–100%) | Not published. In EPA field tests of open burning, airborne lead was under 5–8% of the lead in the material. The bunkers should trap more. The Army's official maps must use 100% (permit, App. B). |
| Release point | 40.809 N, 91.269 W | Between the two magazines (application, 6.9.1). The cloud starts 300 m southwest, for the barrier vents. |
| Blast size | ≈1,590 kg TNT per magazine | About 7,000 lb net explosive weight in all, worked out from the safety distances in the application (Table 4-1); two magazines fired together |
| Dust cloud height | ≈585 m top | Church (1969) cloud-rise formula for high-explosive blasts, capped at the mixing height; most mass in the middle half |
| First 3 hours | Permit weather | Dry, no inversion, wind 1–15 mph, whatever the scenario, because the permit (IV.O.3) bars a blast otherwise |
| Spreading in air | Pasquill–Gifford classes | Gaussian puff that follows the wind hour by hour; wind, cloud and sun height set the class each hour |
| After sunset | Residual layer | When the mixing layer shrinks, lead above its new top stays aloft and stops settling, and mixes back down if the layer grows again (Stull 1988) |
| Direction uncertainty | ±15° (0–30°) | The whole wind field turned in 5° steps; each spot shows the highest value of any direction |
| Particle sizes | 1 / 10 / 30 µm | Default mostly fine, 80/15/5 by mass, since the Army expects mostly particles under 2.5 µm (application, 6.9.4); mixed 50/30/20; soil and debris 20/30/50. Settling by Stokes' law |
| Airborne lead, hourly | 0.18 µg/m³ outline | 1-hour average from the time the puff takes to pass; the permit's informational level |
| Rain or snow | Λ = 10⁻⁴·R^0.8 s⁻¹ | Common washout coefficient; R in mm per hour |
| Weather | NE 7 mph, ~50% cloud, 4% precip | NWS hourly forecast at the plant and 32 points around it, from Wed noon |
Outdoor deposition directly downwind, µg/ft², for a steady 7 mph wind, partly sunny, with the direction held exact. The first 3 hours follow the permit's weather limits, so rain starts 3 hours after the blast, about 20 miles out. The map's ±15° setting widens the colored area to every spot the lead could reach from any direction in that range. Each row changes one input from the central case.
| Scenario | 1 mi | 6 mi | 20 mi | 50 mi | ≥5 out to | ≥100 out to |
|---|---|---|---|---|---|---|
| Central case: 5% escapes, mostly fine, dry | 16 | 7.6 | 3.2 | 1.6 | 10 mi | none |
| Only 1% escapes | 3.2 | 1.5 | 0.6 | 0.3 | none | none |
| 25% escapes | 81 | 38 | 16 | 7.9 | 85 mi | none |
| Permit case: 100% escapes | 324 | 153 | 63 | 32 | 150+ mi | 10 mi |
| Mixed sizes | 40 | 18 | 6.9 | 3.1 | 29 mi | none |
| Soil and debris (coarse) | 81 | 36 | 13 | 5.4 | 53 mi | none |
| Light rain or snow from 3 h after | 16 | 7.6 | 3.2 | 16 | 87 mi | none |
| Moderate rain or snow from 3 h after | 16 | 7.6 | 3.2 | 16 | 62 mi | 30 mi |
| Cloud half as high (bunker holds it down) | 45 | 9.8 | 3.3 | 1.6 | 11 mi | none |
| Overcast, 12 mph | 3.7 | 4.3 | 3.0 | 1.6 | none | none |
All layers come from official public datasets, clipped to this area. Dates are each dataset's own vintage. Things may have changed since.
| Layer | Source | Vintage | Notes |
|---|---|---|---|
| Rivers, streams, lakes | USGS 1:1,000,000-scale hydrography | 2014 ed. | Streams of order 4 and up. Generalized for regional maps, so small creeks and farm ponds aren't shown. |
| Town drinking water source | EPA SDWIS via ECHO | 2026 Q3 | Active community systems serving each town; the town's own municipal system is shown when one exists. SW = surface water, GW = groundwater, * = purchased from another system. Intake locations are not public and are not shown. |
| Public schools | NCES EDGE geocodes | 2024–25 | Iowa, Illinois, Missouri. |
| Private schools | NCES EDGE, Private School Survey | 2023–24 | Schools that answered the federal survey. |
| Iowa livestock facilities | Iowa DNR animal feeding operations | May 2024 | Medium and large operations only; smaller farms are not listed. Facility names and addresses removed. Main animal type estimated from head counts × animal-unit factors. Iowa only. |
| County farm shading | USDA NASS 2022 Census of Agriculture | 2022 | Shading uses quintiles of the counties on this map. "(D)" means USDA withheld the value to protect individual farms. Hog and poultry inventories aren't in this county download. |
| County boundaries | U.S. Census Bureau cartographic boundaries | 2017 | Via the us-atlas package. |
They aren't mapped. Iowa and Illinois publish no downloadable list of licensed centers, and Missouri's list has no map coordinates, so a map would show some states and not others. Look up providers near you with each state's official search: